top of page

Projects

Consultancy Services for preparation of Detailed Project Report for development of Northern Portion of Hyderabad Regional Ring Road Expressway under Bharatmala Pariyojana Phase-I in the State of Telangana; Length: 160 Kms (Sangareddy-Narsapur-Tooparan-Gajewal-Bhongir-Choutippal).

Length / Terrain :

161.518 kms. (6/8 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

August 2021 to Jun 2022 (compliance need to be attended)

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Design length: 161.518 Km; 6 lane Access Controlled Expressway with 8-lane structures (2nos x 14.25m with 22.5m median)

Structural Details:

Major Bridges: 42 Nos. / Minor Bridges: 129 Nos. Underpasses/Interchanges: 124 Nos/09 Nos. / ROBs: 4 Nos. (142 m & 152.8 m)

Consultancy Services to carry out detailed Technical Assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Mumbai – Kolkata Corridor - Expressway).

Length / Terrain :

1133 Kms. (2/4/6 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Jan 2018 - Mar 2021

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Length: 1133 Km (2/4/6 Lane)

Structural Details:

Bridges: 67 Nos.; Culverts (HPC & Box culverts): 513 Nos.; Flyovers: 6 Nos.; Underpasses: 171 Nos.; Foot over Bridges: 8 Nos.

Consultancy services for preparation of Detailed Project Report for Development of Economic Corridors, Inter Corridors, Feeder Routes& Green Field Alignment to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Package 7/Lot-4), in the State of Rajasthan on EPC Mode. Length: 208.242 Km, 6 Lane (Greenfield Alignment) (Amritsar-Jamnagar Expressway).

Length / Terrain :

208.242 kms. (6 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Feb 2018 - Oct 2022

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Length 208.242 Kms, 6 Lane

Structural Details:

Major Bridges: 10 Nos.; Minor Bridges: 20 Nos.; Culverts: 322 Nos.; ROBs: 1 No.; VUPs: 19 Nos.;LVUPs: 34 Nos.; SVUPs: 85 Nos

Consultancy services for project management phase-I including preparation of Detailed Project Report of selected stretches/corridors of National Highways/State roads (Approved “in principal “for declaration as National Highways) in the state of Telangana for up gradation to two/four/six lane with paved shoulder configuration Khammam - Ashwaraopet (Length: 120 Km) and Khammam to Devarapalle as Greenfield Alignment for Length of 162 km (Expressway).

Length / Terrain :

282 kms. (4 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Dec 2016 - Nov 2018

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Total Length: 282 Km (4 Lane with paved shoulders)

Structural Details:

Major Bridges: 18 Nos. (2 nos of 60m, 2 nos of 63m, 2 nos of 69m, 3 nos of 78m, 85m, 100m,105m, 165m, 2 nos of 170m, 240m, 252m, 400m) 2305 m ROBs: 2 Nos. (142 m & 152.8 m) 294.8 m

Consultancy Services for Feasibility Study, Detailed Project Report, Survey, Preparation of Land Plan Schedules for Widening to Two/Four lane with Paved Shoulder from Km. 0.000 to Km. 130.000 of NH-563 on Jagtiyal – Karimnagar – Warangal Road (Expressway) in the State of Telangana on EPC Mode.

Length / Terrain :

126.88 kms. (4 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Dec 2015 - Jul 2022

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Length 126.88 Kms, 4 Lane

Structural Details:

Major Bridges: 15 Nos.; Minor Bridges: 38 Nos.; Culverts: 384 Nos.; ROB / RUBs: 4 Nos. / 1 No.;
VUPs / LVUPs: 44 Nos. / 12 Nos.; Major Junctions: 49 Nos.; Toll Plaza: 1 No. @ Km. 22.100 & 1 No.
@ Km. 80.400

Consultancy Services for Preparation of Detailed Project Report for Development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads to improve the efficiency of freight movement in India (Lot-1/Telangana/Package-2) Armoor-Jagtial Section of NH-63 and Jagtial-Ramagundam Section of NH-563.

Length / Terrain :

124.414 kms. (4 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Apr 2017 - Nov 2018

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Length 125.414 Km, 4 Lane (Green Field Alignment)

Structural Details:

Major Bridges: 8 Nos. (1105m @ Ch. 88+719 on Godavari River; 336m @ Ch. 8+166; 270m @ Ch. 121+429; 216m @ Ch. 42+634; 192m @ Ch. 70+118; 2 nos of 90m @ Ch. 45+205 & Ch. 116+224; 72m @ Ch. 13+212) Minor Bridges: 52 Nos.; Culverts: 248 Nos. (Box Culverts); 21 Nos. (Pipe Culverts); Flyovers: 07 Nos.; VUP / LVUPs: 14 Nos / 13 Nos. SVUPs: 10 Nos.; Interchanges: 3 Nos; Toll Plaza: @ Km. 11+700 (8 Lane Entry + 8 Lane Exit on MCW) and @ Km. 105+200 (8 Lane Entry + 8 Lane Exit on MCW)

Consultancy services for Independent Engineer for Supervision 4-Laning from km 0.000 to km 26.400 (along with 0.700km approach towards NH 207 with interchange on NH4 at start point) of Bangalore to Malur Section (Package-I), from km 26.400 to km 53.500 of Malur to Bangarpet Section (Package-II) and from 53.500 to km 71.000 of Bangarpet to Bethamangala Section (Package-III) of Bangalore Chennai Expressway on Hybrid Annuity Mode (HAM) under Bharatmala Pariyojna, in the state of Karnataka (Phase-I).

Length / Terrain :

71.70 kms. (4 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Jul 2021 - May 2024

Location:

INDIA

Funded By :

Government of India

Association Type:

Lead Member

Pavement Details :

Pavement Type Flexible (Asphalt Concrete) & Rigid 68.700 Km, Flexible Pavement & 3 Km, Rigid Pavement Total Length: 71.70 Km (4 Lane)

Structural Details:

Major Bridges 15 Nos. (270m, 126m, 360m, 126m, 180m, 252m, 90m, 252m, 99.99m, 165m, 150m, 450m, 240m, 125m, 150m) 9070m; ROB 1 no. 108.75m; Minor Bridges: 46 Nos.

Consultancy services for Authority’s Engineer for Construction Supervision of 6-lane access controlled Greenfield highway (Expressway) from Ismailabad on NH-152 to Junction with Jind – Safidon road (SH-14) near Kheri village (Ch. 0+000 to Ch. 80+000, length 80 Km) in the State of Haryana on EPC mode under Bharatmala Pariyojana.

Length / Terrain :

80 Kms. (6 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Feb 2020 - May 2022

Location:

INDIA

Funded By :

Government of India

Association Type:

JV Partner

Pavement Details :

Pavement Type: Perpetual Flexible Pavement (Asphalt Concrete) Total length: 80 Km. (6 Lane)

Structural Details:

Flyover/Interchange: 11 Nos.; Minor Bridges: 18 Nos.; VUPs: 3Nos.; LVUPs: 18 Nos.; SVUPs: 46
Nos.; Box Culverts: 92 Nos.

Consultancy Services for Authority’s Engineer for Construction Supervision 6-lane access controlled Greenfield highway (Expressway) from Junction with NH-334B (Charkhi Dadri - Jhajjar section) near Charkhi Dadri to Narnaul (Ch. 165.000 to Ch. 227.020 length 62.02 Km) in the state of Haryana on EPC mode under Bharatmala Pariyojana.

Length / Terrain :

62.02 Kms. (6 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Dec 2019 - Apr 2022

Location:

INDIA

Funded By :

Government of India

Association Type:

JV Partner

Pavement Details :

Pavement Type: Perpetual Flexible Pavement (Asphalt Concrete) Total length: 62.02 Km. (6 Lane)

Structural Details:

Major Bridges: 4 No. (90m, 108m, 60m & 65m) 323m Minor Bridges: 23 Nos.; ROB: 2No. (84m & 108m) 192m Flyovers: 3 Nos. (180m, 30m & 40m) 250m

Consultancy services for Authority’s Engineer for Supervision of Construction of 8-lane access controlled Greenfield Delhi –Vadodara Expressway (NE-4)starting at Bardawadi village of Mandsaur district to Bawadi village (near Shivgarh) of Ratlam district (Ch. 546+920 to Ch. 627+420) in the State of Madhya Pradesh on EPC mode under Bharatmala Pariyojana.

Length / Terrain :

80.50 Kms. (8 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Dec 2019 - Jan 2023

Location:

INDIA

Funded By :

Government of India

Association Type:

JV Partner

Pavement Details :

Perpetual Flexible Pavement (Asphalt Concrete) Total length: 80.50 Km. (8 Lane)

Structural Details:

Major Bridges: 13 Nos. (105m, 420m, 140m, 70m, 105m, 210m, 60m, 105m, 70m, 140m, 455m, 70m, 315m) 2265m Minor Bridges: 48 Nos.; ROBs: 2Nos. (210m & 111.84m) 321.84m; VUPs: 15 Nos.; LVUPs: 21 Nos.;
SVUPs: 13 Nos.; Box Culverts: 152 Nos.

Consultancy services for Authority’s Engineer for Supervision of Construction of 8-lane access controlled Greenfield Delhi – Vadodara Expressway (NH-148N) starting at Haryana – Rajasthan Border to Junction with Keshopura Road (Ch. 78+800 to Ch. 151+840) in the State of Rajasthan on EPC mode under Bharatmala Pariyojana.

Length / Terrain :

73.04 Kms. (8 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Nov 2019 - Jun 2022

Location:

INDIA

Funded By :

Government of India

Association Type:

JV Partner

Pavement Details :

Perpetual Flexible Pavement (Asphalt Concrete) Total length: 73.04 Km. (8 Lane)

Structural Details:

Major Bridges: 01 No. 150m; Minor Bridges: 5 Nos.; ROBs: 2Nos. (86m & 86m) 172m; Flyovers: 4 Nos. (120m, 120m, 120m &
30m) 390m;

Consultancy services for Authority’s Engineer for Supervision of Construction of 8-lane access controlled Greenfield Delhi – Vadodara Expressway (NH-148N) starting at Sohna – Gurugram Road (NH-248A) near Alipur village to Haryana – Rajasthan border (Ch. 0+000 to Ch. 78+800) in the State of Haryana on EPC mode under Bharatmala Pariyojana.

Length / Terrain :

78.8 Kms. (8 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Sep 2019 - Feb 2023

Location:

INDIA

Funded By :

Government of India

Association Type:

JV Partner

Pavement Details :

Perpetual Flexible Pavement (Asphalt Concrete) Total length: 78.8 Km. (8 Lane)

Structural Details:

Major Bridges: 03 Nos. (60m; 100m; 68m) 228m; Minor Bridges: 22 Nos.; ROBs: 1No. (3060m); Flyovers: 2 Nos. (80m & 135m) 228m; VUPs: 11Nos.;
LVUPs: 12Nos.; SVUP: 47Nos.; Box Culverts: 155Nos.

Consultancy services for Authority’s Engineer for Construction of Access Controlled Nagpur – Mumbai Super Communication Expressway (Maharashtra Samruddhi Mahamarg) in the State of Maharashtra on EPC Mode for Package-01, from Km 0.00 to Km 31.00 (Village Shivmadka to Village Khadki Amgaon).

Length / Terrain :

31 Kms. (6 lane)

Plain

Client:

Maharashtra State Road Development Corporation Limited (MSRDC)

Duration:

Dec 2018 - Jun 2022

Location:

INDIA

Funded By :

Government of India

Association Type:

Lead Member

Pavement Details :

Length: 31 Km; (6 Lane), Rigid Pavement (Access Controlled Greenfield Expressway with design
Speed of 150 km/hour)

Structural Details:

Toll Plaza: 1 No. (10.475) at Main Carriage way 2x10 lanes, 4 No. (on Ramps of Interchange at 29.055; Boundary Wall: 62 Kms; Flyovers: 5 Nos. (Length 30m, 30m, 30m, 60m, 30m) 180 m; Minor Bridges: 18 Nos.; Culverts: 55 Nos.; Canal Bridges: 6 Nos.; VUPs: 9 Nos.; LVUPs: 4 Nos.; CUP/PUPs: 12 Nos.; U􀆟lity Ducts: 27 Nos.; WUPs: 1 Nos.; WOPs: 1 Nos. At Ch. 15.140 – 57.01mtr. X 33.61Mtr.; Vai Ducts: 2 Nos. (As per requirement of WII) At Ch. 23.265, 300Mtr. Long At Ch. 24.100 Mtr. Long

Consultancy services for Independent Engineer Services for 6-laning of Agra-Etawah Bypass (Expressway) section of NH-2 from Km. 199.660 to Km. 323.525 under NHDP Phase V in the State of Uttar Pradesh to be executed on BOT (Toll) mode.

Length / Terrain :

124.49 Kms. (6 lane)

Plain

Client:

National Highways Authority of India

Duration:

May 2017 - Nov 2020

Location:

INDIA

Funded By :

Government of India

Association Type:

JV Partner

Pavement Details :

Flexible Pavement (Asphalt Concrete) Total length: 124.49 Km. (6 Lane)

Structural Details:

Major Bridges: 1 No. 500.04m Minor Bridges: 18 Nos.; ROBs: 1No. (65.1m); Grade Separators: 4 Nos. (210m, 90m, 90m, 390m)
780m;

Consultancy services for Independent Engineer during Operation and Maintenance for the Project of Design, Engineering, Finance, Construction, Operation and Maintenance of Access Controlled Highway Project of Bangalore – Nelamangala (Expressway) Section of NH-4 from Km. 10.000 to Km. 29.500 in the State of Karnataka on Build, Operate & Transfer (BOT) Basis (PPP Project).

Length / Terrain :

19.50 Kms. (6 lane)

Plain

Client:

National Highways Authority of India (NHAI)

Duration:

Jun 2019 - Mar 2023

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 19.50 Kms Elevated Corridor (6 Lane)

Structural Details:

Elevated Corridor-1, FOB: 7 Nos.; ROB – 01 No.; VUPs: 7 Nos.; VUP: 7 Nos.; PUP:14 No

Construction Supervision Consultancy services for Independent Engineer Services during Operation & Maintenance Period for 4 laning and Strengthening of Existing Two lane Road for Trichy to Dindigul Section of NH-45 from Km 333/300 to Km 421/273 in the State of Tamil Nadu under NHDP Phase-III
on BOT Basis & Four laning Project of Thanjavur – Trichy Section (Expressway) of NH-67 from Km 80/000 to Km 136/490 (Package No. NHDP-III/TN/IE/OM/TD & TT). (Design Review & Supervision Services)

Length / Terrain :

144.763 Kms (2/4 lane)

Plain

Client:

National Highways Authority of India

Duration:

Oct 2015 - Dec 2018

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Total Length: 144.763 Km; (2/4 Lane)

Structural Details:

Major Bridges: 7 Nos.; Minor Bridges: 31 Nos; VUP/PUPs: 20 Nos.

Consultancy Services for Construction Supervision of Ethiopian Integrated Transport Program Phase I: Jimma Chida and Sodo – Sawla Roads Upgrading project: Lot 3: Remaining works of Dinke – Sawla – Shifte (74+500 – 150+477

Length / Terrain :

75.98 Kms

Hilly

Client:

Ethiopian Roads Authority ETHIOPIA

Duration:

April 2024 - Ongoing

Location:

ETHIOPIA

Funded By :

African Development Fund (ADB)

Association Type:

Lead Partner

Pavement Details :

Flexible Pavement (Asphalt Concrete) with different width cross-section (2/4 Lane)

Structural Details:

Bridges: 12 Nos.; Slab Culverts: 7 Nos.; Box Culverts: 20 Nos.; RCC Pipe Culverts: 6 Nos.;

Consulting Services for the Monitoring of Output and Performance-Based Road Contract (OPRC) Package 19 (Chongwe, Rufunsa and Luangwa Districts) and Package 20 (Chilanga, Kafua and Chirundu Districts) in Lusaka Province-RDA/CS/OIS/001/023

Length / Terrain :

Pkg-19 = 283.757 Kms
Pkg-20 = 256.482 Kms

Hilly

Client:

Road Development Authority ZAMBIA

Duration:

February 2024 - Ongoing

Location:

ZAMBIA

Funded By :

World Bank

Association Type:

Lead Partner

Pavement Details :

2 Lane Gravel Road

Structural Details:

Major Structures: 28 Nos.; Box Culverts: 9 Nos.; Pipe Culverts: 392 Nos.

Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for Improvement & Upgradation of about 300 Km Roads under Assam Disaster Resilient Hill Area Road Development Project (ADRHARDP)

Length / Terrain :

300 Kms

Hilly

Client:

Chief Engineer (EAP), PWRD, Assam

Duration:

Jul 2024 - Ongoing

Location:

INDIA

Funded By :

World Bank

Association Type:

JV Partner

Pavement Details :

Flexible Pavement

Structural Details:

Major Bridges: 2 Nos.; Minor Bridges: 17 Nos; ROB: 1 Nos.; Culverts: 568 Nos.;

Contract for Consultancy Services for feasibility study, Design and DPR preparation of about 265 Bridges requiring maintenance, Bridges to be widened, temporary bridges to be replaced with RCC Bridges, New double lane RCC Bridge in missing gaps, distressed bridges to be replaced including replacement of all collapsed/ washed out bridges due to flooding & land sliding in all districts of Assam – GROUP-C – Assam Resilient Rural Bridge Program. Additionally, 42 Nos of Bridges (34 Nos of Bridges vide No. CE/EAP/ARRBP/WB/6/2024/3 dated: 18.10.2024 and 08 Nos of Bridges vide no. CE/EAP/ARRBP/WB/6/2024/5 dated: 03.12.2024.) has been awarded for preparation of DPR

Length / Terrain :

307 Nos of Bridges

Plain

Client:

Public Works Roads Department, Government of Assam

Duration:

Jan 2023 - Jun 2023

Location:

INDIA

Funded By :

World Bank

Association Type:

Sole

Pavement Details :

Flexible Pavement

Structural Details:

307 Nos
of Bridges

Consultancy Services for Feasibility Study and Preparation of Detailed Projects Report for PMGSY and MMGS Works in Yavatmal District, Maharashtra. Length 102.182 Kms,

Length / Terrain :

102.182 Kms

Plain

Client:

Maharashtra Rural Road
Development Association

Duration:

Jan 2022 - Aug 2022

Location:

INDIA

Funded By :

63.602 Km length funded by ADB & 38.58 Km length funded by DPC

Association Type:

Sole

Pavement Details :

Flexible Pavement

Structural Details:

Consultancy Services for Feasibility Study and Preparation of Detailed Projects Report for PMGSY and MMGS Works in Chandrapur District, Maharashtra. Length 12.4 Kms

Length / Terrain :

12.4 Kms

Plain

Client:

Maharashtra Rural Road
Development Association

Duration:

Dec 2022 - Jul 2023

Location:

INDIA

Funded By :

5.8 Km length funded by ADB & 6.6 Km length funded by DPC

Association Type:

Sole

Pavement Details :

Flexible Pavement

Structural Details:

Consultancy Services for Feasibility Study and Preparation of Detailed Projects Report for PMGSY and MMGS Works in Bhandara District, Maharashtra. Length 37.705 Kms

Length / Terrain :

37.705 Kms

Plain

Client:

Maharashtra Rural Road
Development Association

Duration:

Nov 2022 - Jun 2023

Location:

INDIA

Funded By :

16.3 Km length funded by ADB, 8.4 Km length funded by DPC & 12.970 Km length funded by R&D

Association Type:

Sole

Pavement Details :

Flexible Pavement

Structural Details:

Consultancy Services for Feasibility Study and Preparation of Detailed Projects Report for PMGSY and MMGSY Works in Amravati District, Maharashtra. Length 55.78 Kms

Length / Terrain :

55.78 Kms

Plain

Client:

Executive Engineer, PMGSY Amravati

Duration:

Nov 2022 - Jun 2023

Location:

INDIA

Funded By :

32.45 Km length funded by ADB, 3.15 Km length funded by DPC & 20.18 Km length funded by R&D

Association Type:

Sole

Pavement Details :

Flexible Pavement

Structural Details:

Consultancy Services for Feasibility Study and Preparation of Detailed Projects Report for PMGSY and MMGSY Works in Nagpur District, Maharashtra. Length 81.753 Kms

Length / Terrain :

81.753 Kms

Plain

Client:

Executive Engineer, PMGSY Nagpur

Duration:

Nov 2022 - Jun 2023

Location:

INDIA

Funded By :

5.8 Km length funded by NABARD, 18.753 Km length funded by DPC, 35.240 Km length funded by ADB & 21.960 Km length funded by R&D

Association Type:

Sole

Pavement Details :

Flexible Pavement

Structural Details:

Construction Supervision Consultancy services for Independent Engineer Services for Balance works for Four Laning of Amravati-Chikhli section of NH-6 [Package-II from km 220.000 (Near Kurankhed) to km 270.000 (Near Shelad)] in the state of Maharashtra to be executed on Hybrid Annuity mode (HAM) under Bharatmala Pariyojna

Length / Terrain :

50 km. (4 lane)

Plain

Client:

National Highways Authority of India

Duration:

Aug 2021 - Nov 2023

Location:

INDIA

Funded By :

Government of India

Association Type:

Lead Partner

Pavement Details :

Flexible (Asphalt Concrete) & Rigid
Length: 50 Km (4 Lane)

Structural Details:

Major Bridges 04 Nos. (150.8m, 90m, 80m, 120m) 440.8m
ROB 1 no. 74.370m; Minor Bridges: 26 Nos.; Culverts: 56 Nos.

Construction Supervision Consultancy Services for Authority's Engineer for Four laning with paved shoulder from Meerut to after bridge over River Yamuna, Haryana via Sham Ii from km 0+000 to 88+476 of NH 709A (0 at Meerut on ch. 67+550 of NH 58) in the State of Uttar Pradesh on EPC mode

Length / Terrain :

83.776 Km. (4 lane)

Plain

Client:

National Highways Authority of India

Duration:

Aug 2020 - Nov 2023

Location:

INDIA

Funded By :

Government of India

Association Type:

JV Partner

Pavement Details :

Flexible (Asphalt Concrete) & Rigid Length: 50 Km (4 Lane) Length 83.776 Kms, 4 Lane (82.576Km Flexible and 1.2Km Rigid Pavement)

Structural Details:

Major Bridges 03 Nos. (135m, 62m, 598m) 765m
ROB: 1 no.; Minor Bridges: 5 Nos.; Culverts: 160 Nos. VUPs: 11 Nos

: Construction Supervision Consultancy services for Independent Engineer Services for Four Laning of Kallagam to Karuppur from Km. 38+700 to Km. 50+382 and Two Laning with Paved Shoulders from Karuppur to Meensurutti from Km. 50+382 to Km. 98+433 of NH-227 under Bharatmala Pariyojana (Residual Projects under NHDP Phase-IV) in the State of Tamil Nadu on Hybrid Annuity Mode (HAM).

Length / Terrain :

59.73 Km. (4 lane 11.682 Km & 2 Lane 48.051 Km.)

Plain

Client:

National Highways Authority of India

Duration:

Apr 2019 - Nov 2023

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible (Asphalt Concrete) & Rigid Length: Total Length: 59.73 Km; (11.682 Km, 4Lane & 48.051 Km, 2 Lane)
38.378 Km, Flexible Pavement
21.355 Km, Rigid Pavement

Structural Details:

Major Bridges: 1 No.; ROBs: 1 No.; Minor Bridges: 18 Nos (8-New, 7-Reconstruction & 3-Widening); LVUPs: 2 Nos.; PUP/Cattle Underpass: 1 Nos.; Box Culverts: 59 Nos. (14-New, 35-Reconstruction & 10-Widening); Bypass: 4 Nos. 17.205 Km (9.305 Km, 4 Lane & 7.900 Km, 2 Lane); Toll Plaza: 1 Nos. (Km 69.595)

Construction Supervision Consultancy services for Authority’s Engineer for Supervision of Balance work of Rehabilitation and Up-gradation Satna - Bela section of NH-75 from KM 155+00 to Km. 202+040 (Design Length 47.040 Km.) to four lane with paved shoulder under NHDP-IV through Engineering, Procurement & Construction (EPC) in the state of Madhya Pradesh on EPC Mode

Length / Terrain :

47.04 Km. (4 lane)

Plain

Client:

PWD NH Division, Rewa, Government of Madhya Pradesh

Duration:

Jul 2018 - Feb 2020

Location:

INDIA

Funded By :

Government of India

Association Type:

Lead Partner

Pavement Details :

Flexible (Asphalt Concrete)  Length: 47.04 Km; (4 Lane)

Structural Details:

Major Bridges: 1 No. 250 m; Minor Bridges: 22 Nos.; ROBs: 2 Nos (Lengths: 51.4m & 127.6m) 179 m; Culverts: 60 Nos.

Construction Supervision Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and Up-gradation to 2 Lane with Paved Shoulder / 4-Lane Standards of National Highway Section (I) Bhandara – Ghotitok Section of NH-247 (Length – 37.47 Km) & Section (II) Amdi – Saoner of NH-753 (Length 39.58 Km) on EPC Mode (NH/MAH/PWD/Nagpur-1/AE/PKG-12) Length 77.058 Km

Length / Terrain :

77.058 Km. (2/4 lane

Plain

Client:

National Highway Division, Nagpur

Duration:

Sep 2017 - Jun 2020

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible (Asphalt Concrete) & Rigid 8.15km; 4 Lane with Paved Shoulder & 48.91km; 2 Lane Total Length: 77.058 Km; (2/4 Lane)

Structural Details:

Major Bridges: 3 Nos. (95.3m, 73.525m & 65.476m) 234.301 m; Minor Bridges: 19 Nos.

Construction Supervision Consultancy services for Authority’s Engineer for Supervision of Rehabilitation and upgradation to 2 lane with paved shoulder/ 4-lane standards of National Highway Section (i) Nandgaon – Morshi section of NH-753K (Length - 43 km) & Section (ii) Morshi to MH/MP State Border section of NH-353k (length – 52.39 km) on EPC Mode (NH/MAH/PWD/Nagpur -7/AE/Pkg-18).

Length / Terrain :

95.39 Km. (2/4 lane)

Plain

Client:

National Highway Division, Nagpur

Duration:

Sep 2017 - Jun 2020

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible (Asphalt Concrete) & Rigid  4 Lane in built-up section and balance 2 lane with Paved Shoulder in Rigid Pavement - 14.3km (4 Lane) & 81.09km (2 Lane) Total Length: 95.39 Km; (2/4 Lane)

Structural Details:

Major Bridges: 2 Nos (Length 60.30m & 105m) 165.30m, Minor Bridges: 42 Nos; VUP: 1 Nos.; Box Culverts: 22 Nos.; HP Culvert: 97 Nos.; Toll Plaza: 2 No.

Construction Supervision Consultancy services for Authority’s Engineer for Supervision Supervision Work of Rehabilitation and Upgradation of Chikhali - Khamgaon Section of National Highways-548CC (Km 43+962 to Km 100+065) to Two Lane with Paved Shoulder Configuration in the State of Maharashtra on EPC Mode

Length / Terrain :

56.103 Km. (2 lane with Paved houlders)

Plain

Client:

National Highway Division, Nagpur

Duration:

Sep 2017 - Jun 2020

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible (Asphalt Concrete) & Rigid 2 Lane Paved Shoulder in Rigid Pavement and 4 Lane in Rigid Pavement with Flexible Overlay (4 Lane – 3.108 Km; 2 Lane – 45.220 Km; Flexible Overlay – 1.538 Km) Total Length: 56.10 Km; (2 Lane)

Structural Details:

Culverts: 64 Nos.; Minor Bridges: 10 Nos.

: Construction Supervision Consultancy services for Authority’s Engineer for Supervision of “Widening of road two lane with paved shoulders including Construction of Bridges and Culvert in Km 1+00 to 49+40 (Length: 48.7 Kms) on NH-26A (Sagar – Bina Road) on EPC mode in the State of Madhya Pradesh on EPC Mode.

Length / Terrain :

48.70 Km. (2 lane with Paved Shoulders)

Plain

Client:

PWD NH Division, Sagar, Government of Madhya Pradesh

Duration:

Aug 2017 - Feb 2020

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible (Asphalt Concrete) Length: 48.7 Km; (2 Lane)

Structural Details:

Major Bridges: 1 No. 120m; Minor Bridges: 6 Nos.; Culverts: 85 Nos.; ROBs: 1 No. 75.2 m

Construction Supervision Consultancy services for Authority’s Engineer for Supervision Work of Rehabilitation and Up-gradation of NH-12A from Km. 246.849 to Km. 317.406 (Kawardha - Simga Section) to Two Lanes with Paved Shoulders under NHDP-IV on EPC Basis in the State of Chhattisgarh.

Length / Terrain :

71.093 Km. (2 lane)

Plain

Client:

National Highway Zone, PWD Raipur (C.G.)

Duration:

May 2015 - Apr 2017

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Rigid Pavement Total length: 71.093 Km. (2 Lane)

Structural Details:

Major Bridges: 1 No. (341 m); Minor Bridges: 5 Nos.; Culverts: 37Nos.; VUPS: 1 No.

Construction Supervision Consultancy services for Independent Engineer for Two Laning of Shirur Tajband Narsi Road and Two Laning with Paved Shoulder of Narsi Biloli to State Border Road SH.225 Km 0/00 to 105/200 under Design, Built, Finance, Operate & Transfer Scheme.

Length / Terrain :

105.20 Km.(2 lane)

Plain

Client:

Public Works Division, Nanded

Duration:

Jul 2013 - Sep 2014

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Total length: 105.20 Km. (2 Lane)

Structural Details:

Minor Bridges: 20 Nos. & Culverts: 46 Nos.

Construction Supervision Consultancy services for Independent Engineer for the BOT work “Four Laning of Nanded – Narsi Road and Two Laning Improvement of Narsi – Degloor to State Border Road (MSH-6) Km. 264/00 to 341/700 under DBFOT in the State of Maharashtra.

Length / Terrain :

77.70 Km. (2/4 lane)

Plain

Client:

Public Works Division, Nanded

Duration:

Sep 2012 - May 2015

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible (Asphalt Concrete) & Rigid Pavement 43.00 Km (4 lane); 34.70 km (2 lane) Total length: 77.70 Km. (2/4 Lane)

Structural Details:

Major Bridges: 3 Nos.; Minor Bridges: 19 Nos.

Construction Supervision Consultancy services for Independent Engineer for the work of Four Laning and Improvement of Karanji – Wani – Ghuggus – Chandrapur (upto Padoli Junction) Road of MSH-6 & 7 in Yavatmal & Chandrapur under Design, Built, Finance, Operate & Transfer Scheme (PPP Mode).

Length / Terrain :

85.112 Km. (2/4 lane)

Plain

Client:

Public Works Division, Pandharkawada

INDIA

Duration:

Sep 2011 - Mar 2015

Location:

INDIA

Funded By :

Government of India

Association Type:

JV Partner

Pavement Details :

Flexible (Asphalt Concrete) & Rigid Pavement 51.192 Km; 4 lane & 33.92 km; 2 lane Total length: 85.112 Km. (4/2 Lane)

Structural Details:

Major Bridges: 2 Nos.; Minor Bridges: 9 Nos.

Construction Supervision Consultancy services for Independent Engineer for the work of four laning of Berala Fata Chikhali Amdapur Khamgaon up to NH-6 in Buldana District under Build Operate & Transfer Scheme.

Length / Terrain :

68.30 Km. (4 lane)

Plain

Client:

Public Works Division, Buldana

Duration:

Apr 2011 - Apr 2014

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 68.30 Km. (4 Lane)

Structural Details:

Major Bridges: 3 Nos, Minor Bridges: 27 Nos

Supervision Consultancy Services for the Construction of Four lanned Hinganghat ROB including Approaches, Underpasses and Service Road at Km. 76.380 on Nagpur-Hyderabad Section of NH 44 (Old NH-7) in lieu of existing level crossing No. 14-A (Rly CH, 792/6-8) on Wardha-Bllarshah Section in the State of Maharashtra. Contract Package No. NS-59-A(MH); Consultancy Package No. NS-2/5-A

Length / Terrain :

ROB Length: 1.15 Km

Plain

Client:

National Highway Authority of India

Duration:

Nov 2010 - Jun 2018

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement

Structural Details:

ROB: 1.15Km (4 Lane)

Construction Supervision Consultancy services for Independent Engineer for 4 lanning of Road from Jalna-Deulgaonraja-Berala including Construction of 4 lane Bypass of Deulgaonraja under BOT Basis.

Length / Terrain :

77.41 Km. (4 lane)

Plain

Client:

Public Works Division, Buldana

Duration:

Jan 2010 - Jan 2013

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 77.41 Km. (4 Lane)

Structural Details:

Major Bridges: 3 Nos, Minor Bridges: 36 Nos

Construction Supervision Consultancy services for Independent Engineer Services during Operation & Maintenance Stage of 4/6 lanes Stretch from Km. 40.000 to Km. 221.500 of Hyderabad Vijayawada Section of NH-65 (Old NH No. 9) Package No. NHDP-III/BOT/AP-01 on DBFOT Basis in the States of Telangana and Andhra Pradesh

Length / Terrain :

181.50 Km. (4/6 lane)

Plain

Client:

National Highways Authority of India,

Duration:

Jun 2018 - Sep 2023

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 181.50 Km. (4/6 Lane)

Structural Details:

Major Bridges: 3 Nos; Minor Bridge: 45 Nos. VUPs: 17 Nos.; PUP: 29 Nos.

: Construction Supervision Consultancy services for Independent Engineer Services during Operation & Maintenance Stage of 4 Laning of Walayar – Vadakkancherry from existing Km. 182.250 to Km. 240.000 (Design Length 54.00 Km) in the State of Kerala under NHDP-Phase-III executed on BOT (Toll) on DBFOT Basis (PPP Project).

Length / Terrain :

54 Km. (4 lane)

Plain

Client:

National Highways Authority of India,

Duration:

Oct 2018 - Oct 2023

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 54 Km. (4 Lane)

Structural Details:

Major Bridges : 1 Nos; VUPs: 7 Nos.; PUP: 4 Nos.

: Construction Supervision Consultancy services for Independent Engineer Services during Operation and Maintenance Period for Chhattisgarh/Maharashtra Border to Wainganga Bridge Section from Km. 405.000 to Km. 485.000 of NH-6 in the State of Maharashtra under NHDP Phase IIIA on Build Operate and Transfer (BOT) Basis – Consultancy Package No. IE-O&M/NH-6/NAG-2

Length / Terrain :

72.06 Km. (4 lane)

Plain

Client:

National Highways Authority of India,

Duration:

May 2016 - Dec 2019

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 72.06 Km. (4 Lane)

Structural Details:

Major Bridges : 4 Nos; Minor Bridges: 13 Nos.; VUPs: 6 Nos.; PUP:5 Nos.

Construction Supervision Consultancy services for Independent Engineer Services during O&M Period for the Project of “Design, Engineering, Finance, Construction, Operation and Maintenance of End of Durg Bypass – Chhattisgarh / Maharashtra Border Section from Km. 322.4 to Km. 405 of NH-6 under NHDP Phase-IIIA on Build, Operate and Transfer (BOT) Basis” in the State of Chhattisgarh

Length / Terrain :

82.60 Km.(4 lane)

Plain

Client:

National Highways Authority of India,

Duration:

Oct 2015 - Dec 2018

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 82.60 Km. (4 Lane)

Structural Details:

Major Bridges: 3 Nos.; Elevated Corridor: 6.5 Kms
 Flyover: 06 Nos.; VUP/PUPs: 10Nos.

Construction Supervision Consultancy services for Independent Consultancy Services during Operation & Maintenance Phase of Six Laning of Pimpalgaon – Nashik - Gonde Section of NH-3 from Km 380.000 to Km 440.000 in the State of Maharashtra on DBFOT (Toll) Basis under NHDP Phase-III

Length / Terrain :

60 Km. (6 lane)

Plain

Client:

National Highways Authority of India,

Duration:

Aug 2015 - Jan 2019

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 60 Km. (6 Lane)

Structural Details:

Major Bridges: 3 Nos.; Elevated Corridor: 6.5 Kms
Flyover: 06 Nos.; VUP/PUPs: 10Nos.

Construction Supervision Consultancy services for Independent Consultancy Services during Operation & Maintenance Phase of Four Laning of Pimpalgaon-Dhule Section of NH-3 from Km 380.000 to Km 265.000 in the State of Maharashtra on BOT (Toll) Basis under NHDP Phase-III

Length / Terrain :

118.158 Km. (4 lane)

Plain

Client:

National Highways Authority of India,

Duration:

Jun 2014 - Jun 2017

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 118.158 Km. (4 Lane)

Structural Details:

Major Bridge: 02 Nos.; Flyover: 01 No.; ROB: 01 No.; VUP/PUP: 19 Nos.

Construction Supervision Consultancy services for Independent Consultancy Service during Operation & Maintenance Phase of Four Laning of Vadape-Gonde Section of NH-3 from km 539.500 to Km 440.00 in the State of Maharashtra on BOT (Toll) Basis under NHDP Phase-III.

Length / Terrain :

99.50 Km. (4 lane)

Plain

Client:

National Highways Authority of India,

Duration:

Jun 2014 - Jun 2017

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 90.50 Km. (4 Lane)

Structural Details:

Major Bridge: 3 Nos.; ROB: 06 Nos.; VUP: 04 Nos.; PUP: 29 Nos

Construction Supervision Consultancy services for Independent Engineer (IE) Services during Operation and Maintenance Period of Six Laning of Samakhiali – Gandhidham Section of NH-8A from Km 306.000 to Km 362.160 on the State of Gujarat to be executed as BOT (Toll) on Design, Build, Finance, Operate and Transfer (DBFOT) under NHDP Phase V.

Length / Terrain :

56.16 Km.(6 lane)

Plain

Client:

National Highways Authority of India,

Duration:

Nov 2015 - Jan 2019

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 56.16 Km. (6 Lane)

Structural Details:

Flyover: 3 Nos.; Major Bridges :4 Nos; Major Bridges :23 Nos ;ROB:4 Nos, VUP/PUP: 10 Nos.

Construction Supervision Consultancy services for Consultancy Services for Independent Engineer during Operation & Maintenance (O&M) Period for 4-Laning of Pune-Solapur Section of NH-65 (erstwhile NH-9) from Km 150.050 to Km 251.325 in the State of Maharashtra under NHDP Phase-III Package-II on DBFOT Basis.

Length / Terrain :

101 Km. (4 lane)

Plain

Client:

National Highways Authority of India,

Duration:

Sep 2016 - Feb 2023

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 101.00 Km. (4 Lane)

Structural Details:

Major Bridges: 7 Nos, Minor Bridges: 21 Nos; Flyovers: 1 No.; Culverts: 204+4(under COS); VUPs/PUPs: 23 Nos.

Consultancy services for Independent Independent Engineer services during Operation & Maintenance Period for "4 laned stretch from Km.367.000 (Adloor Yellareddy) to Km.464.000 (Gundla Pochanpalli) (Contract Package No.NS-2/BOT/ AP-2) on Nagpur - Hyderabad Section of NH-44 (Old NH-7) in the State of Telangana on BOT (Annuity) Basis under North - South Corridor (NHDP Phase-II) and additional highway from Km.464.000 (Gundla Pochanpalli) to Km.474.000 (Bowenpalli)"

Length / Terrain :

113.076 Km. (4 lane)

Plain

Client:

National Highways Authority of India,

Duration:

Sep 2016 - Jan 2020

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 113.076 Km. (4 Lane)

Structural Details:

Major Bridges: 1 No, Minor Bridges: 17 Nos; Culverts: 310 Nos.; VUPs/PUPs: 29 Nos.

Construction Supervision Consultancy services for Independent Engineer Services during Operation & Maintenance Phase of 4 laned Dhule - Pimpalgaon (Km 265 - Km 380) Section of NH 3 (New NH-60) in the State of Maharashtra.

Length / Terrain :

118 Km. (4 lane)

Plain

Client:

National Highways Authority of India,

Duration:

Jul 2017 - Feb 2023

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement (Asphalt Concrete) Length: 118.00 Km. (4 Lane)

Structural Details:

Major Bridges: 4 Nos, Minor Bridges: 28 Nos; Flyovers: 4 Nos.; ROBs: 4 Nos.; Overpass: 4 Nos.; VUPs/PUPs/NVUPs: 22 Nos.

Consultancy Services for preparation of Detailed Project Report (DPR) for elevated corridor throughout the Imphal City (length 25 km) in the State of Manipur.
Length: 25 km (Himalayan Region)

Length / Terrain :

25 km (elevated corridor)

Hilly

Client:

MORT&H and NHIDCL

Duration:

Jun 2021 - Oct 2023

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement

Structural Details:

Elevated Corridor: 25 Km
Section-1: 1x50+1x40+13x50+1x40+44x50+1x40+9x50+1x40+5x50+1x40+3x50+1x40+13x50+4x40+5x50+3x40+1x24+1x40+1x33+1x24+14x50+2x40+10x50+1x33+1x27+1x33+1x25+2x50+1x30+1x34+1x22+1x33+14x50+1x53+x31x50+3x40+1x50+1x40+3x30+1x38+1x40+56x50+9x50+1x40+9x50
Section-2: 1x33+5x50+3x40+30x50+1x40+23x50+1x40+61x50
Flyover Link: 1x40+1x50+2x40+1x35+2x50+1x35+1x40+2x35
Ramps - 1 : 15 x25; Ramps - 2 : 11 x25; Ramps - 3 : 14 x25; Ramps - 4 : 12x25

Consultancy Services for Feasibility Study and Preparation of Detailed Project Report (DPR) for Improvement of Roads within Imphal City with Rigid Pavement including Concrete Lined Drains. (Rigid Pavement)

Length / Terrain :

537 Kms

Hilly

Client:

Project Director, PIU, EAP, PWD Manipur, Imphal

Duration:

Apr 2022 - Feb 2024

Location:

INDIA

Funded By :

Government of India

Association Type:

JV (Partner

Pavement Details :

Rigid Pavement

Structural Details:

Consultancy Services for Feasibility Study and Preparation of Detailed Project Report for Two lane with Paved Shoulders including Strengthening of Ratnagiri – Kolhapur Section of NH-166 from Km. 0/000 to Km. 137/285 in Ratnagiri and Kolhapur District in the State of Maharashtra

Length / Terrain :

134.069 km. (2/4 lane)

Plain

Client:

National Highways Authority of India

Duration:

Jun 2015 - Jan 2022

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Length 134.069 Km (16.78 Kms, 6 lane + 101.829 Kms, 4 lane + 15.46 Kms, 2 lane)

Structural Details:

Major Bridges: 9 Nos. (79.5m LHS & 106m RHS @ Ch. 81.500; 76.44m @ 83.972; 6 Nos of 75.45m @ Ch. 84.645, Ch. 89.380, Ch. 90.453, Ch. 90.900, Ch. 91.155, Ch. 93.150; 66.90m @ 103.925)
Minor Bridges: 47 Nos.; Flyovers: 05 Nos; RoBs: 01 No.; Culverts: 466 Nos.; Bypasses: 6 Nos.; Toll Plazas: 2 Nos.

Consultancy Services for Project Management Phase I including Preparation of Detailed Project Report of Selected Stretches/Corridors of National Highways/State Roads (Approved “in principle” for declaration as National Highways) in the State of Telangana for up gradation to Two/Four lane with Paved Shoulder configuration of Deverkonda – Peddavuru – Miryalaguda - Kodad

Length / Terrain :

117.626 km. (2/4 lane)

Plain

Client:

Roads & Building Department, Telangana

Duration:

Nov 2016 - Dec 2017

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Length 117.626 Km; 4 lane with paved shoulder: 42.346 Km (2x8.5m with 5m median) & 2 lane with paved shoulder: 75.28 Km (10m)

Structural Details:

Major Bridges: 1 No. (63 m)

Consultancy Services for Preparation of Detailed Project Report for Review of Capacity of Nagpur-Bhandara Road NH-53 (Old NH-6) in the State of Maharashtra for 6-lane configuration.

Length / Terrain :

58.565 km. (4/6 lane)

Plain

Client:

National Highways Authority of India

Duration:

Mar 2017 - Jan 2018

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Length 68.565 Km; 6 lane with paved shoulder: 59.365 Km (2x12m with 5m median); 4 lane with paved shoulder: 9.20 Km (2x8.5m with 5m median)

Structural Details:

Major Bridges: 8 Nos. (Lengths: 600m, 529.2m, 390m, 112m, 107m, 86m, 2nos. of 60m) 1944.20 m; Flyovers: 4Nos. (Lengths: 311m, 108m, 78m, 40m) 537 m

Consultancy Services for Preparation of Detailed Project Report (DPR) for 4 laning of Meerut-Nazibabad Section of NH-119 in the State of Uttar Pradesh

Length / Terrain :

94.20 km. (4 lane)

Plain

Client:

National Highways Authority of India

Duration:

Sep 2015 - Sep 2017

Location:

INDIA

Funded By :

Government of India

Association Type:

Lead Member

Pavement Details :

Length 94.20 Km; 4 lane

Structural Details:

Major Bridges: 05 Nos.; Minor Bridges: 15 Nos.; ROBs: 01 No. (1920m); Culverts: 243 Nos.; Toll Plazas: 2 Nos.

: Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and improvement of 4 lane with improvement of Junctions, median, RCC Drain, Footpath with PQC in (i) Km. 704/227 to Km. 709/000 (Kanhan Town Existing 10 m section) (ii) Km. 712/000 to Km. 715/000 (Kamptee to Bhilgaon Naka – existing 7 – 10 m section) of Urban link of Nagpur Kamptee section of Nagpur Jabalpur Road NH-44 (Old NH 7)
Package-I: Km. 704/200 to Km. 723/000 (Kanhan to Nagpur near Automotive Square) excluding the length from km. 709.000 to km. 710.000 of Kanhan Bridge & its approaches

Length / Terrain :

17.80 km. (6 lane)

Plain

Client:

National Highways Authority of India

Duration:

May 2015 - Aug 2016

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Length 17.80 Km; 6 lane

Structural Details:

Minor Bridges: 8 Nos. (Box Cell Bridge)
RUBs: 1 No. At Uppahvadi Km. 721/572 (Railway Ch. 13/500) 'Type - Push Box Cell (2 x 9.60m)

Consultancy Services for Preparation of Detailed Project Report for Rehabilitation and improvement of 4 lane with Rigid Pavement including improvement of Junctions, median, RCC Drain, Footpath with PQC in (i) Km. 704/227 to Km. 709/000 (Kanhan Town Existing 10 m section) (ii) Km. 712/000 to Km. 715/000 (Kamptee to Bhilgaon Naka – existing 7 – 10 m section) of Urban link of Nagpur Kamptee section of Nagpur Jabalpur Road NH-44 (Old NH 7)
Package-II: Km. 723/000 to Km. 729/200

Length / Terrain :

6.20 km. (8/6 lane)

Plain

Client:

National Highways Authority of India

Duration:

May 2015 - Jul 2016

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Rigid , Length 6.20 Km; 8/6 lane

Structural Details:

RUB: 1 No. At Km. 727/340 Type - Push Box Cell (2 x 9.0m)
Double Decker Flyover: Crossing at Kadbi Square, 10 No. Pulia, Indora Square, Teka naka & Automotive Square; Length: From km 723.000 to km 726.995 (3.995 km) with Span Arrangement 107 x 30.0 + 6 x 40.0 + 4 x 45.0 + 2 x 35.0, Configurations: 8/6 Lane with 2.50m/l.60m cycle lane & 1.75m Footpath cum drain on either side; Ground Level: At G.L. Improvement to existing carriageway (1st Tier – 2 x 8.50m (Total width-20m) for Vehicular movement & 2nd Tier -2 x 4.50 m for Metro)

Consultancy Services for Preparation of Feasibility Report cum Detailed Project Report (DPR) for Capacity Augmentation to 2 lanes with Paved Shoulder Configuration of National Highways in the State of Uttar Pradesh for Package-VII, 4-laning of NH-56 (about 10 Km Length) including ROB

Length / Terrain :

17.25 km. (4 lane)

Plain

Client:

Ministry of Road Transport & Highways

Duration:

Jan 2015 - Dec 2016

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Length 17.25 Km; 4 lane

Structural Details:

Flyovers: 1 No. (3400 m); ROBs: 1 No. (64.08 m)

Consultancy Services for Preparation of Detailed Project Report (DPR) for Development of Economic Corridors, Inter Corridors, Feeder Routes and Coastal Roads to improve the efficiency of freight movement in India (Lot-1/Maharashtra/Package-2) – Variation for inclusion of Nagpur City Road under Development of IMS at Nagpur.

Length / Terrain :

17 km

Plain

Client:

National Highways Authority of India

Duration:

Nov 2017 - Sep 2018

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Length 17 Km;

Structural Details:

Flyovers: 5 Nos. (Length 4140m, 4510m, 1305m, 1215m & 1022m)
Elevated Corridor on ring Road from Jaitala Sq. to Khamla Sq. Ch. 6+210 to Ch. 10+350 of length 4140m
Elevated Corridor on ring Road from Suyog Nagar Sq. to Hudkeshwar Sq. Ch. 11+740 to Ch. 16+250 of length 4510m
Flyover from Medical Sq. to Ashok Nagar Sq. Ch. 0+350 to Ch. 1+610 of length 1305m Flyover at Tukdoji Sq. Ch. 0+175 to Ch. 1+390 of length 1215m
Flyover at Bhande Plot Sq. Ch. 1+750 to Ch. 2+772 of length 1022m
ROB: 1 No. Cable Stayed at Ajni Station Ch. 0+874 to Ch. 1+681 of length 807 m

Consultancy Services for Preparation of Project Report, Plan and Profile (P&P) and Estimate of Stretch from Km 471+300 (Gundla Pochampally) to Km 481+331 (Bowenpally) for upgradation of existing 4 lane Highway & Service Road to 6 lane Highway with Service Road Configuration in the State of Telangana.

Length / Terrain :

10 km

Plain

Client:

National Highways Authority of India

Duration:

Apr 2019 - Jul 2019

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Length 10 Km;

Structural Details:

Flyovers: 3 Nos. (Total length of Flyovers with Six lane configuration 3795 m) ROBs: 1 No.

Consultancy Services for preparation of Detailed Project Report of newly declared National Highways in the State of Madhya Pradesh for up gradation to 2/4-lane with paved shoulder configuration” under Package-V in the state of Madhya Pradesh

Length / Terrain :

266.88 km. (2/4 lane)

Plain

Client:

National Highway Zone,
Public Works Department

Duration:

Jan 2017 - Aug 2020

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

257.60 Km, 2 lane with Paved Shoulder & 9.28 Km, 4 lane Total Length 266.88 Km; 2/4 lane

Structural Details:

Major Bridges: 10 Nos. (270 m, 4 Nos - 150 m, 2 Nos - 100 m, 420 m and 1440 m) 2930 m
Minor Bridge: 44 Nos.; Flyovers/VUPs: 10 Nos. (5 Nos - 35.0 m and 5 Nos - 14.0 m) & VOPs: 2 Nos

Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for the work of Selected Corridors of Road Networks in the State of Maharashtra for up gradation to Two lane with Paved Shoulders/Four lane configuration for the work of Amravati (Nandgaon) – Morshi – Warud – Pandhurna Road.

Length / Terrain :

95.39 km. (2/4 lane)

Plain

Client:

National Highway Division, Akola

Duration:

Jul 2016 - Mar 2021

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Rigid, 14.30 Kms, 4 lane + 81.09 Kms, 2 lane Total Length 95.39 Km; 2/4 lane

Structural Details:

Major Bridges: 3 Nos. (Lengths: 64.5m, 60m, 105m); Minor Bridges: 42 Nos.; Flyovers: 1 No. (Length: 60m); Toll Plazas: 2 Nos.

Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for the work of Selected Corridors of Road Networks in the State of Maharashtra for up gradation to Two lane with Paved Shoulders/ Four lane configuration for the work of Package No. III/6 ‘Stretch starting from Korchi – Deori- Chichagad – Amgaon – Gondia

Length / Terrain :

103.20 km. (2/4 lane)

Plain

Client:

National Highways Authority of India

Duration:

Mar 2017 - Apr 2021

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Total Length 103.20 Km; 2/4 lane

Structural Details:

Major Bridges: 2 Nos. (Length: 90m, 60m); Minor Bridges: 42 Nos.; ROBs: 2 Nos. (Length: 216m, 158m); Culverts: 377 Nos.; Toll Plazas: 1 No

Preparation of Feasibility Report of NH-78 from Katni – Shahdol - Anoopur up to Chhattisgarh Border.

Length / Terrain :

248.35 km. (2 lane)

Plain

Client:

Madhya Pradesh Road Development Corporation Ltd.

Duration:

May 2013 - Aug 2015

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Total Length 248.35 Km; 2 lane

Structural Details:

Major Bridges: 7 Nos (Lengths: 73.5m, 150.22m, 136.67m, 176.50m, 270m, 107.215m, 135.54m) – 1049.645 m
Minor Bridges: 55 Nos.; ROBs: 8 Nos.; Underpasses: 6 Nos

Consultancy Services for Project Management including Preparation of Detailed Project Report of selected Stretches/Corridors of National Highways for up gradation to Two/Four lane with Paved Shoulder configuration – Package 8: Stretch starting from Gondkhairi – Sangam – Wanadongri – Hingna – MIHAN – Gumgaon – Salaidhaba – Butibori – MIDC – Takalghat – Asola – Seldoh – Singhi Rly – Hamdapur – Sewagram – Wardha NH 361.

Length / Terrain :

87.82 km. (2 lane)

Plain

Client:

National Highway Division, Nagpur

Duration:

Jul 2016 - Mar 2018

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Total Length 87.82 Km; 2 lane

Structural Details:

Major Bridges: 6 Nos. (Lengths: 120m, 102.40m, 2 Nos. of 96m, 2 Nos. of 75m) – 564.40 m Minor Bridges: 25 Nos.; ROBs: 1 No.; Toll Plazas: 1 No.; Culverts: 273 Nos.

Consultancy Services for Preparation of Feasibility Study and Detailed Project Report for the work of Selected Corridors of Road Networks in the State of Maharashtra for up gradation to Two lane with Paved Shoulders/Four lane configuration for the work of Amravati (Nandgaon) – Morshi – Warud – Pandhurna Road. (Yawli – Khed – Atner – As Variation)

Length / Terrain :

56.36 km. (2 lane)

Plain

Client:

National Highway Division, Akola

Duration:

Sep 2016 - Jun 2017

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Total Length 56.36 Km; 2 lane

Structural Details:

Major Bridges: 2 Nos.; Minor Bridges: 15 Nos.; Culverts: 166 Nos.; Toll Plaza: 1 No. @ Km. 32.800

Consultancy Services for Feasibility Study and Detailed Project Report Preparation for Two laning of Joram – Koloriang Road from Km 70.00 to Km 138.00 (Length 68 Km) in the State of Arunachal Pradesh under Arunachal Pradesh Package of SARDP-NE on EPC Mode

Length / Terrain :

62.99 km. (2 lane)

Hilly

Client:

National Highways & Infrastructure Development Corporation Ltd.

Duration:

Aug 2015 - Apr 2018

Location:

INDIA

Funded By :

Government of India

Association Type:

Lead Partner

Pavement Details :

Total Length 62.99 Km; 2 lane

Structural Details:

Minor Bridges: 07 Nos; Culvers: 270 Nos.

Consultancy Services for preparation of Feasibility Study and Detailed Project Report for 2 laning /2 lane with paved shoulder of Champai – Seling section of NH-6 in Mizoram under SARDP Phase-B on EPC mode

Length / Terrain :

140.04 km. (2 lane)

Hilly

Client:

Ministry of Road Transport & Highways

Duration:

May 2015 - Feb 2021

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Total Length 140.04 Km; 2 lane

Structural Details:

Major Bridges: 02 Nos.; Minor Bridges: 06 Nos.

Consultancy Services for Project Management including Preparation of Detailed Project Report of Selected Stretches/Corridors of National Highways/State Roads (approved “In Principle” for declaration as National Highways) in the State of Andhra Pradesh for up gradation to Two/Four lane with Paved Shoulder configuration (CS Puram – Singarayakonda (on NH 16) Road Section)”.

Length / Terrain :

90 km. (2/4 lane)

Plain

Client:

Roads & Building Department, Hyderabad

Duration:

Jul 2016 - Mar 2017

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Total Length 90 Km; 2/4 lane

Structural Details:

Major Bridges: 02 Nos.; Minor Bridges: 14 Nos.

Consultancy Services for Carrying out Feasibility Study, Detailed Survey/investigation, Alignment Option, Preparation of General Arrangement Drawing and Engineering Report for Construction of Proposed ROBs & their Approaches in replacement of Existing Level Crossings as per finalized RFP in the State of Andhra Pradesh (Package-2)

Length / Terrain :

ROBs-14 No’s

Plain

Client:

Ministry of Road Transport & Highways

Duration:

Sep 2014 - Jun 2017

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement

Structural Details:

ROBs: 14 Nos.
Ch. 96+800 Rly Ch, 74/4-5 LC No. 48 E (C-Class) - 2.12 m (4 Lane)
Ch. 133+200 Rly Ch. 109/5-6 LC No. 67 - 1.70 m (4 Lane)
Ch. 145+200 Rly. Ch, 121/4-5 LC No. 75 - 1.43 m (4 Lane)
Ch. 183+600 Rly Ch. 145/500-600 LC No. 95/BE/T-2 - 1.28 m (4 Lane)
Ch. 226+800 Rly Ch. 188/1-2 LC No. 119B/E-2 - 1.385 m (2 Lane)
Ch. 272+600 Rly Ch. 93/15-17 LC No. 95 SPL/3E - 2.71 m (4 Lane) Ch. 281+200 Rly Ch. 101/2-3 LC No. 102/3E - 1.23 m (4 Lane)
Ch. 3+600 Rly Ch. 35/20-22 LC No. 23/SPL - 1.125 m (4 Lane)
Ch. 7+800 Rly Ch. 39/42-44 LC No. 18A/SPL - 1.34 m (4 Lane)
Ch. 12+400 Rly Ch. 44/26-28 LC No. 14 SPL - 1.605 m (4 Lane)
Ch. 56+700 Rly Ch. 189/3-4 LC No. 120/BE-2 - 1.00 m (2 Lane)
Ch. 56+100 Rly Ch. 136/5-6 LC No. 88T - 1.40 m (2 Lane)
Ch. 189+400 Rly Ch. 115/5-7 LC No. 83 - 1.80 m (2 Lane)
Ch. 563+200 Rly Ch. 108/1-2 LC No. 17 - 0.958 m (4 Lane)

Consultancy Services for Carrying out Feasibility Study, Detailed Survey/investigation, Alignment Option, Preparation of General Arrangement Drawing and Engineering Report for Construction of Proposed ROBs & their Approaches in replacement of Existing Level Crossings as per finalized RFP in the State of Andhra Pradesh (Package-1)

Length / Terrain :

ROBs-15 No’s

Plain

Client:

Ministry of Road Transport & Highways

Duration:

Sep 2014 - Jun 2017

Location:

INDIA

Funded By :

Government of India

Association Type:

Sole

Pavement Details :

Flexible Pavement

Structural Details:

ROBs: 15 Nos.
Ch. 1+800 Rly Ch. 203/16-18 LC No. 124E/SPL3 - 1.55 m (4 Lane)
Ch. 57+600 Rly Ch. 35/6-7 LC No. 26 T (C-Class) - 0.92 m (2 Lane)
Ch. 64+800 Rly Ch. 42/8-9 LC No. 30E (C-Class) - 1.425 m (4 Lane)
Ch. 86+100 Rly Ch. 64/8-9 LC No. 41E (C-Class) - 0.81 m (2 Lane)
Ch. 93+400 Rly Ch. 70/9-71/0 LC No. 45 C (Class) - 1.23 m (4 Lane)
Ch. 152+400 RLY Ch. 7/1-2 LC No. 8 OUE - 1.48 m (2 Lane)
Ch. 162+200 Rly Ch. 105/5-6 LC No. 114T/SPL3 - 1.68 m (2 Lane)
Ch. 170+400 RLY. Ch. 97/6-7 LC No. 104E/SPL3 - 1.40 m (2 Lane)
Ch. 183+700 RLY Ch. 84/1-2 LC No. 93E/SPL3 - 1.68 m (4 Lane)
Ch. 200+400 RLY Ch. 68/0-1 LC No. 79E/SPL3 - 1.28 m (4 Lane)
Ch. 226+400 RLY. Ch. 46/6-7 LC No. 55E/SPL3 - 2.58 m (4 Lane)
Ch. 230+600 Rly Ch. 44/2-3 LC No. 52T/SPL3 - 1.18 m (2 Lane)
Ch. 231+700 RLY Ch. 2/1-2 LC No. 3E/SPL3 - 1.20 m (2 Lane)
Ch. 515+200 Rly Ch. 324 - 1.45 m (4 Lane)
Ch. 274+240 Rly Ch.106/9-107/0 LC No. 55/A - 1.20 m (2 Lane)

bottom of page